

Projects
Here is a small showcase of some of our previous jobs. Most of these jobs were done onsite and same day turn around with some exception due to parts availability. In most cases parts availability is not an issue and we can source most parts within a day. Afterhours parts are also available from our vendors.

Ram 6.7 Cummins Turbo
We replaced the stock turbo with a aftermarket non-VGT turbo per customer request. Original was fine customer just wanted to go bigger.

Bolt Extractions
"...One broken bolt away from having a bad day." No bad days around here. We have the experience for situations just like this.

ISB 6.7 Cummins
Customers fan clutch bearing failed catastrophically. The failure also damaged the bearing housing so a whole new housing was needed.

Wheel Seal
Run of the mill wheel seal replacement.

Eaton Fuller 10 Speed
Customer couldnt go into high gear and broke down on the road. Found the air module was no longer sending air for high gear. Replaced air module and driver was back on the road!

Hino 268
Customers truck was dripping everywhere. Found the oil pan gasket was the problem. Oil pan gasket R&R and this truck was good to go.